Wednesday, July 30, 2008

The Last Touches










The craftsman at work - his hot (literally in Texas) workshop. Note the new miter saw with moveable sawhorses. Steve has always wanted sawhorses.
The third picture is Len installing the shoe base molding under the countertop for the "finished" look. (Note: the molding we purchased at Home Depot had Woodgrain Molding stickers on it.) This photo was taken at 10 p.m. Tuesday, July 29th. Len had gone to Six Flags over Texas on Monday with Erlynne and Ethan -he had a great time, but now he is trying to finish up all the projects before he flies back home the next day. In fact, he stayed up til 3:30 a.m. grout caulking around the edges of the tile and switches.









The NEW breakfast bar, complete with bar stools. Where it used to be a useless pony bar is a comfortable place to sit to eat or chat. The supports are called "carbals", and after looking at several kinds, we purchased these from Lowes $7 for a set of two, brushed nickel. Len installed the 3 inch base board over the top of the screws and support beam (with considerable routing and chiseling to make them fit flat) This is a work of art too.












Here is a close up of the edges of the backsplash. The two on the right are the side next to the table light switch. The other end pictured is next to the back door, now the breakfast bar.
As I type this, Len is installing the last of the GCFI electrical outlets in the bathrooms. That way, no one will get electricuted while they are playing in water.
I take Len to the airport this afternoon for his flight back home. I will miss him here, but will have constant reminders everywhere of what a skilled and talented craftsman he is. I will be forever indebted to him for making my house look so beautiful.

Sunday, July 27, 2008

Almost (so close) to being done!

Saturday we were not able to grout the newly installed back splash because the mastic had not set up. Len and I stayed up until 2:30 a.m. Saturday morning, finishing up the intricate cuts for the tile in the back splash. I got to sleep about 3 a.m., and woke at 7:15 so I could return the rented tile wet cut saw to Home Depot before 8:30 a.m.











So, Saturday, we did finish project - the end cap to cover where the pony bar jutted out into the walk way between the two counters/cabinets to the kitchen table. Steve worked on installing the removed old counter tops as shelving in the garage, specifically, a place to hold his new toy - a miter saw, that Len has been using to do all the cuts and angles for the wood working projects. I painted sealer on the floor grout lines, mopped the new tile, and cleaned up a lot of areas.

Sunday morning Len was up by 7 a.m. cleaning and preparing the back splash for the grout. He and Steve applied the grout while I went to choir. They even cleaned up all the grout sand before they got to Sacrament Meeting. It looks amazing! Now you can see the completed pictures.

Len also installed GFCI electrical plugs for the areas in the kitchen near water sources. So we are up to the new safety codes.

Dallin, Erlynne, Chris, Ethan, and Tristan joined Steve, Len, and me for a nice dinner in our newly remodel space. For the first time, we all ate in comfort and space! I love my new kitchen.

Friday, July 25, 2008

Backsplash Today







Cutting tile to fit, spreading mastic, pressing tile to the wall, inserting spacers, all in a day's work!














Thursday, July 24, 2008

Kitchen nearing completion

Today saw the installation and varnishing of baseboards, connecting the vent duct for the microwave, trimming, polishing, etc. We assembled the new bar stools for the kitchen, replaced the commode in the guest bathroom, and completed a myriad of little tasks--refitting outlets, adjusting trim, caulking, grouting, etc. Check out the pictures. Went to Floor & Decor to get the edge pieces for the backsplash, which goes in tomorrow. Then to Home Depot for the last pieces of baseboard and other odds and ends, including a 13" tile cutter.











































Another day, another dozen projects done

No pictures today, just an update.

Cleaning up tile, walls, etc. after a tile installation takes time. Len started working on the new base boards for the kitchen and pantry. He had done the laundry room and guest bathroom baseboards on Tuesday. The guest bathroom boards were "drying" from the stain and topcoat, and he installed the laundry room baseboards Tuesday night, after which we brought the dryer and washer back into the room and I started the first batch of much needed clean clothes at 10 p.m.

Wednesday morning I did a run to the grocery store to stock up on supplies, continued to do laundry, and cleaning and organizing more things in the kitchen. Len cut the base boards for the pantry and installed it in the small "space", after which I caulked the top and floor line with white caulk to prevent water from getting to the boards. Len cut the boards for the floor in the kitchen.

I need to explain Len's "cutting the baseboards". He doesn't do a simple miter cut and attach it to the wall. He measures, writes it on a slip of paper, measures again, then cuts the board a little longer, takes the board into the house and measures again. He bevels the tops and bottoms of the board to snug into the different levels of the tile, knotches around face plates, using a coping saw to notch the top piece to join at the corner. He sands and planes until the joint or the corner is perfect. One 12 foot piece of base board had a tiny crack in it, which we hadn't seen when we purchased it, but he found a way to get wood glue into the crack, clamped it for about 30 minutes, and then sanded it. When it was my turn to do a fine sanding and staining on the piece, I could not find the crack, and I knew right where it was! Len installs the baseboards by pre-drilling each hole with a small bit, then tapping the thinnest nail into the hole until 1/16th of an inch is still showing, never hitting the wood. Then he uses a nail set to sink the nail, and wood putting to file the holes. His work is art!

Steve drove from Sherman for the evening, arriving just as dinner was ready. We ate our dinner, prepared in my wonderful kitchen, and ate it sitting at the kitchen table in the family room. (After the baseboards are in, we will move the table back to the kitchen.) Then Steve and Len removed the doors from the fridge, I removed all the food into boxes, and they moved the fridge from the gameroom back into the kitchen, attached the new water filter to the water line, put the doors back on the fridge (no easy task with double doors with water hook ups in the door), and I loaded the food in.

My advice: have a plan of action, write it down, and cross the items off the list as they are completed. Our list was long of things that needed to be done. The list grows shorter.

Tuesday, July 22, 2008

The tile is laid, the appliances are going back in...















The tile guys showed up this morning after 9 a.m. to lay the last seven tiles of the last box at the back door to the garage and in the pantry. While one guy did that, the younger brother, cleaned the tiles and started putting in the bone colored grout. They finished up and left about noon.










While they were doing their work, Len was cut and measuring the new baseboards for the guest bathroom. After he cut them all perfectly (they are works of art in and of themselves), I stained and polyurathaned them to match the paneling. He cut and installed the new white base boards for the laundry room, and while I caulked the laundry room and buffed the new tile, Len installed the dishwasher. After supper we brought the washer and dryer from the garage in through the kitchen, using cardboard on the floors to prevent any marks in the new grout, and hooked them up. It is now 11:30 p.m. and I have already washed two batches of much-needed clothes. Tomorrow we will cut, stain, and install the new baseboards in the kitchen, and when Daddy comes from Sherman tomorrow evening, they will move the fridge from the game room back into the kitchen. (That is a feat all by itself - removing the food, removing the doors, getting the huge things through the kitchen doorway, the doors back on, the food put back in the fridge, etc.)
My advice: if you are going to remodel your kitchen, have a very talented and skilled brother come help you do it! Len is amazing.









Monday, July 21, 2008

Hard work over the weekend, etc....the installation continues

Steve and Len scraping off linolium glue Saturday night. Sweating!

Sunday night, begin 9 p.m., Len attaches the carbells under the over hang on the counter tops. At 11 ish, they start mapping out the radiant floor heating wires to cover the kitchen floor. Steve comes to bed at 6 a.m., Len takes a nap at 7:30 a.m.

Tile installation guys (two) arrive after 10:30 a.m. See the pictures of their finished work and their excellent progress. It is now 4:15 p.m. and they have the hall and guest bathroom to tile, and the last strip through the kitchen to the back door.










More pictures tomorrow after they come to grout and finish it all up. Do you like it?
I love it. My new kitchen! Next we just have to put everything back in place - washer, dryer, fridge, dishwasher, and kitchen table and chairs. That is, after the cleaning up!